Grills grill longer with riveted joints

March 18, 2004
A leading manufacturer of universal grill burners needed a stronger bond on the mounting brackets for its burner assemblies. The bond had to outlast the grill's five-year warranty and be quick to produce.

Heavy-duty stainless steel burners include C and oval shapes and one or two-tube models, and fit most makes and models of gas grills. A custom, double-hit, impact riveting work cell streamlined the fastening process, reducing handling time and setup costs.
 

Time-tested impact riveting proved to be the best option. It replaced a locking compression joint, which was costly and prone to failure. Impact riveting uses a short, soft metal rivet with a single head. The fastener first inserts through-holes in the burner. An impact then deforms the rivet and creates a second head that firmly locks parts in place.

The riveting process employs an Adtech impact riveter from Orbitform, Jackson, Mich. (www.orbitform.com). The machine is said to be the only heavy-duty unit (≥6 tons) with automatic rivet feed and all-mechanical drive.

The Adtech machines emphasize safety because the ram stops midcycle if an operator releases the actuators. Rated power is up to 40 tons throughout full stroke range. Cycle times are less than 1 sec, and rivet setting force is adjustable.

Using high-speed riveting, the grills assemble quickly, and burners and brackets have uniform tightness. Production costs reportedly are lower because of less prefabrication and fixturing. Parts that had previously taken over 3 min to adjust and fasten now assemble in 20 sec, with stronger joints that last longer.
-- Kenneth Korane

Sponsored Recommendations

Sept. 16, 2025
From robotic arms to high-speed conveyors, accuracy matters. Discover how encoders transform motor control by turning motion into real-time datadelivering tighter speed control...
Sept. 16, 2025
Keep high-torque gearboxes running efficiently with external lubrication and cooling systems delivered fast. Flexible configurations, sensor-ready monitoring, and stocked options...
Sept. 16, 2025
Now assembled in the U.S., compact P2.e planetary gear units combine maximum torque, thermal efficiency, and flexible configurations for heavy-duty applicationsavailable faster...
Aug. 22, 2025
Discover how to meet growing customer demands for custom products without overextending your engineering team. Learn how scaling your automation strategy can help you win more...

Voice your opinion!

To join the conversation, and become an exclusive member of Machine Design, create an account today!