PBC Linear Hevi-Rail Bearings Help Technicians Refuel Nuclear Plant

June 2, 2009
PBC Linear Hevi-Rail bearings help technicians refuel nuclear plant
PBC Linear, www.pacific-bearing.com

When a nuclear plant needed its fuel rods changed, technicians had to unbolt all 54 of the 700-lb studs securing the reactor-vessel head. The studs were painstakingly placed in square racks that constantly needed to be repositioned under the crane that removed and transferred the studs, a time-consuming and risky process. To simplify the task, engineers at Quality Engineered Products, Holden, Maine, built a stud rack modeled after a lazy Susan. The 42-in.-diameter rack could be manually turned to accept new studs and did not need to be repositioned as the crane moved. One key to the success of the new rack was Hevi-rail heavyduty linear and axial bearings from PBC Linear, Roscoe, Ill. They let the rack rotate smoothly and could easily support the weight of nine reactor studs. Once in use, the new lazy-Susan rack halved the time needed to remove and replace studs, letting the plant go back on line much sooner.

Sponsored Recommendations

June 27, 2025
Ensure workplace safety and compliance with our comprehensive Lockout/Tagout (LOTO) Safety Training course. Learn critical procedures to prevent serious injuries.
June 27, 2025
Join our expert webinar to discover essential safety control measures and best practices for engineering a truly safe and compliant industrial environment.
June 25, 2025
An innovative aircraft with electric drives combines the best of both worlds. The cross between drone and helicopter could mean significantly faster and more efficient air emergency...
June 25, 2025
Effective when other materials fail, ceramics are particularly suitable for applications requiring wear and chemical resistance, sliding characteristics or biocompatibility. Discover...

Voice your opinion!

To join the conversation, and become an exclusive member of Machine Design, create an account today!