How External Loads Affect Bolted Joints

April 20, 2010
Forces that overcome preload can cause bolted assemblies to leak, rattle, and fail.

Authored by:
Moo-Zung Lee
West Hills, Calif.

Edited by Kenneth J. Korane
[email protected]

Key points:
• External loads that exceed the preload can cause joints to leak and assemblies to rattle.

• Controlling separation load is critical for precision preloading on mechanisms such as bearings.

Resources:
“Structural Properties of Bolted Joints,” Machine Design, Feb. 18, 2010, p. 44.

Detailed free-body diagrams of bolted joints can be found in Juvinall and Marshcek, Fundamentals of Machine Component Design, John Wiley & Sons, 1991

Understanding the structural behavior of bolted joints is paramount for good designs, and one key factor is how joints react to external loads.

In sorting out these reactions, remember that preloaded bolted joints are integral mechanical components consisting of a bolt and clamped members. Its structural properties markedly differ from those of the bolt itself.

Bolt and member forces

As the accompanying loading-process diagrams depict, a bolt reacts with tension when the nut is tightened to clamp joint members. The bolt stretches and clamped members compress from their free states by δb and δc, respectively. Bolt tension and clamped-member compression equal the initial clamping (preload) force, Fi, in absolute terms. Sign convention shows positive force for tension and negative for compression:

Fb = kbδb = Fi, and
Fc = kcδc = -Fi.

Applying an external force, Fe, to the preloaded joint elongates the bolt by x, and forces in the bolt and clamped members readjust. As long as external force is not enough to completely relieve the preload, the following relations hold:

Fb(x) = Fi + kbx,
Fc(x) = –Fi + kcx, and
Fb(x) + Fc(x) = Fe(x).

Substituting x = Fe/(kb + kc) links forces of the bolt and clamped member directly to the external force and eliminates the need to know the displacement. If we define the bolt load-sharing ratio Ï• as:

Ï• = kb/(kb + kc), then
Fb(x) = Fi + Ï•Fe and
Fb(x) = Fi + (1 – Ï•)Fe.

The Fb(x) equation indicates combined bolt tension is the sum of the initial tension from preload and a portion of the external load. The bolt load-sharing ratio is the fraction of external load on the bolt, with 0 < Ï• <1. A typical Ï• value for a structural joint is about 0.2 to 0.5. For hard, thin, and wide clamped members, Ï• approaches 0. For compliant joints, such as those with a soft gasket, Ï• approaches 1.

Bolt-load-sharing ratio is an important parameter because it can be used to more-accurately calculate bolt stresses than using the sum of preload and external load. On the other hand, the Fc(x) equation needs be checked to ensure clamping force is sufficient to prevent seals from leaking.

Joint separation
When external force is large enough to completely relieve preload, the bolt carries the entire external force:

Fb(x) = Fe(x) and
Fc(x) = 0, for x ≥ xsp = Fi/kc.

External load that is just sufficient to completely relieve the preload on clamped members is the critical external load for joint separation, or separation load. Calculate it from:

Fsp = Fi/(1 – Ï•).

The separation load ratio λ is 

Separation load is proportional to the initial preload, and the separation load ratio is a function only of Ï•.

It takes external forces larger than the initial preload to separate a joint. This is because an external load concurrently reduces clamping force while increasing bolt force. Without enough preloading, a pressure joint leaks or a mechanical assembly rattles under vibration. Rattling means rapid reversing spikelike shocks that make parts impact each other. Mechanical systems generally do not tolerate bolted-joint separation, especially for sensitive equipment or instruments in vibrating environments.

Controlling separation load is critical for precision preloading mechanisms such as bearings. These devices cannot afford to lose preload yet work best with low preloads. Unnecessarily high preloads increase friction and may overheat the bearing, or otherwise consume too much power during operation.

The bolt-load-sharing ratio affects both the combined bolt load and how well a joint stays preloaded. For instance, the accompanying load-sharing diagrams show external, bolt, and member forces for Ï• = 0.25 and 0.4. As you can see, load sharing distinctly differs before and after joint separation.

Force-displacement diagrams depict preloading and external loading processes, as shown. For a bolted joint, bolt and member stiffnesses are fixed, as are the slopes of Fb and Fc. For a different preload Fi, both lines shift but keep the same slopes, as shown by the dashed lines.

As noted above, x = Fe/(kb + kc). And the stiffness, ke, of the preloaded bolted joint for external load is the sum of the bolt and clamped-member stiffnesses. Thus, under preloaded conditions:

ke = Fe/x = kb + kc.

After joint separation, Fc = 0, the bolt bears the entire external load, and joint stiffness equals bolt stiffness, ke = kb.

The external-force paradox

Because an external pull increases bolt tension and decreases member compression at the same time, shouldn’t the magnitude of the external force equal the difference of the two? If so, then joint stiffness should be the difference between the stiffnesses of the bolt and members.

The diagrams that show external force as the sum of changes in bolt and member force treat external loading as if it were a two-step process. An external load is assumed to stretch the bolt first and then relieve compression on the members.

Suppose an external force, Fe, of unknown magnitude stretches a preloaded bolted joint at the seating plane of the nut by x from preloaded conditions. It needs an external force, F1 = kbx, just to elongate the bolt beyond its preloaded condition. Because clamped members must also relax by x from their initially compressed state, the clamping force must be reduced by F2 = kcx. Because clamping force comes from the nut, an external force F2 is required to compel the nut to relent (without rotating). F2 is in addition to the bolt stretching force F1. Therefore, the total external force is: Fe = F1 + F2.

The two forces take parallel routes. Force F1 follows the path from the nut through the thread engagement and bolt rod and to the bolt head on the other end. Force F2 travels from the seating surface of the nut through the clamped members, then reaches the bolt head. F1 increases bolt tension, F2, reduces member compression.

The root of the paradox is due to the deviation from the sign convention of forces. An external pull increases bolt tension and decreases member compression at the same time. Member compression is a negative force. Decreasing a negative force in absolute magnitude requires a positive force.

About the Author

Kenneth Korane

Ken Korane holds a B.S. Mechanical Engineering from The Ohio State University. In addition to serving as an editor at Machine Design until August 2015, his prior work experience includes product engineer at Parker Hannifin Corp. and mechanical design engineer at Euclid Inc. 

Sponsored Recommendations

50 Years Old and Still Plenty of Drive

Dec. 12, 2024
After 50 years of service in a paper plant, an SEW-EURODRIVE K160 gear unit was checked. Some parts needed attention, but the gears remained pristine.

Explore the power of decentralized conveying

Dec. 12, 2024
Discover the flexible, efficient MOVI-C® Modular Automation System by SEW-EURODRIVE—engineered for quick startup and seamless operation in automation.

Goodbye Complexity, Hello MOVI-C

Dec. 12, 2024
MOVI-C® modular automation system – your one-stop-shop for every automation task. Simple, future-proof, with consulting and service worldwide.

Sawmill Automation: Going Where Direct-Stop and Hydraulic Technologies “Cant”

Aug. 29, 2024
Exploring the productivity and efficiency gains of outfitting a sawmill’s resaw line with VFDs, Ethernet and other automated electromechanical systems.

Voice your opinion!

To join the conversation, and become an exclusive member of Machine Design, create an account today!