U.S.'s new supercarrier

June 7, 2007
The Navy's next aircraft carrier, CVN-78, or the Gerald R. Ford, is currently being built by Northrup Grumman Corp. at its shipyard in Newport News, Va.

 

The ship will be almost 1,100 ft long, displace 100,000 tons, and have a top speed of over 30 knots. It will carry two nuclear reactors, which will give the ship two to three times the electrical output of Nimitz-class carriers. The carrier will need that electricity to power electromagnetic catapults and arresting gear. There's also supposed to be electrical capacity left over to support beam weapons that may come online in the ship's estimated 50-year operational life.

Other changes include an island positioned farther aft to make room for aircraft queuing for launches from the forward catapults. The island will also be smaller because command and control spaces have been moved below decks for security. And a composite mast reduces weight by up to 20 tons. The $13 billion ship should be completed in 2015.

Sponsored Recommendations

Sept. 16, 2025
From robotic arms to high-speed conveyors, accuracy matters. Discover how encoders transform motor control by turning motion into real-time datadelivering tighter speed control...
Sept. 16, 2025
Keep high-torque gearboxes running efficiently with external lubrication and cooling systems delivered fast. Flexible configurations, sensor-ready monitoring, and stocked options...
Sept. 16, 2025
Now assembled in the U.S., compact P2.e planetary gear units combine maximum torque, thermal efficiency, and flexible configurations for heavy-duty applicationsavailable faster...
Sept. 16, 2025
Safety in automation goes beyond fences and emergency stops. Learn how functional safety actively monitors and controls motiondelivering smarter protection, greater flexibility...

Voice your opinion!

To join the conversation, and become an exclusive member of Machine Design, create an account today!