U.S.'s new supercarrier

June 7, 2007
The Navy's next aircraft carrier, CVN-78, or the Gerald R. Ford, is currently being built by Northrup Grumman Corp. at its shipyard in Newport News, Va.

 

The ship will be almost 1,100 ft long, displace 100,000 tons, and have a top speed of over 30 knots. It will carry two nuclear reactors, which will give the ship two to three times the electrical output of Nimitz-class carriers. The carrier will need that electricity to power electromagnetic catapults and arresting gear. There's also supposed to be electrical capacity left over to support beam weapons that may come online in the ship's estimated 50-year operational life.

Other changes include an island positioned farther aft to make room for aircraft queuing for launches from the forward catapults. The island will also be smaller because command and control spaces have been moved below decks for security. And a composite mast reduces weight by up to 20 tons. The $13 billion ship should be completed in 2015.

Sponsored Recommendations

Aug. 22, 2025
Discover how to meet growing customer demands for custom products without overextending your engineering team. Learn how scaling your automation strategy can help you win more...
Aug. 22, 2025
Join industry leaders to explore how cutting edge digital technologies are transforming factories. Learn how to boost throughput, enhance flexibility, and accelerate your digital...
Aug. 22, 2025
Explore the future of manufacturing. Learn how to leverage the latest digital technologies and strategies to build a more efficient, agile, and resilient digital factory.
Aug. 21, 2025
A look into the latest improvements in motion control through high-performance drives, AI enhancements, and faster communication protocols.

Voice your opinion!

To join the conversation, and become an exclusive member of Machine Design, create an account today!